UCOL, Wanganui

UCOL Wanganui’s new campus was a project with a value of $30 million.

KOA worked on the draughting of the building structure along with our shop detailing team who were involved in the structural and precast panel design.

Kevin O’Connor was Project Manager, he specialises in structural engineering, siteworks and construction administration.

The campus consisted of new multi-storey blocks, an administration block, strengthening of existing blocks and structural underpinning, design of landings and stairs, precast and structural steel shop drawings, and construction observation services.

Copyright Kevin O’Connor & Associates Ltd 2017